临江市聚宝电站项目 |
|
一、项目简介
1.项目概况:临江市聚宝电站建于临江市五道沟河,总装机容量为1.89万千瓦,年平均发电量为725l千瓦时
2.合作方式:合资
3.项目总投资:2058万美元(17020万)
4.需外方投资内容:资金,设备。
5.建设地点:临江市五道河中上游五人把村
7.预计经济效益:正常年收入1867.49万元,年利润1471.6万元,年税金28.0l万元,投资回收期为9年。
8.项目进展情况:可研批文,吉计经农字(1994)153号
二、中方概况
1.企业名称:吉林省临江市水电股份有限公司
法定地址:吉林省临江市鸭绿江大酒店
法定代表人:张雁鸣
2.所有制形式:股份制企业
3.企业概况:临江市水电股份有限公司现有员工800人,注册资本3000万元,现有资产6700万元,年平均实现利税8l0万元,临江地区水电资源非常丰富,大小水电站几十家,装机容量达36393kw,全年发电5200万度,公司下属两个工厂:宏业高温材料厂,年产3000吨镁碳砖,冶炼厂年产3500吨工业硅,出口日本。
4.可为项目提供的建设和生产条件:厂房、土地、部分设备、技术。
5.联系方法:
通讯地址:吉林省临江市鸭绿江大酒店
邮政编码:134600
项目联系人:颜世才 张雁鸣
电话:86—439—5222867 5231538
传真:86—439—5222186
|
|
Linjiang City Jubao Hydropower Plant Project
Ⅰ.Brief introduction synopsis of the project
(1) Panorama of the project:Linjiang City Jubao Hydropower Plant was built by Wudaogou River of Linjiang City.Its total installed capacity power installation is 18900 kw. Its annual average generating capacity is 72,510,000kwh.
(2) Ways of corporation:joint venture
(3) Total investment of the project:USD 2,0580,000(RMB 170,200,000 yuan)
(4) The content of investment needs from foreign countries:capital ,equipment
(5) Construction site:Wurenba Village,Mid-up Wudaogou River of Linjiang City
(6) Intending economic benefits:normal annual income RMB 18,674,900 yuan,annual profits RMB14,716,000 yuan,annual tax RMB280,100 yuan,annual profits RMB8,470,000 yuan,reclaiming period of investment is 9 years
(7) Processing status of the project:feasibility study is required,JJJN
Zi,Nu.(1994)153
Ⅱ.Panorama of Chinese side:
(1) Name of enterprise:Water Aned electricity St6ock Limited Company Of Linjiang City,Jilin Province
Legal address:Yalujiang Grand Hoted Of Linjiang City,Jilin Province
Legal representative:Zhang Yanming
(2) Form of ownership:joint stock
(3) Panorama of enterprise:Linjiang City Hydropower Stock Co.,Ltd.now has 800 staff.Its registered capital is RMB30,000,000 yuan.The assets is RMB67,000,000 yuan.Annual average profits and taxes is RMB 8,100,000 yuan.There is very rich water and electricity resource at Linjiang district.Scores of water power plant locate there.Installed capacity power installation is up to 36393 kw and the generating capacity of a whole year is 52,000,000 degrees.Two plants attached to the company:Hongye High Yemperature Material Plant,produceds 3000 tons of magnesium carbonized bricks per year,Smelting Plant ,produces 35,000,000 tons of inustrial silicon which exports to Japan.
(4) Construction and manufactured conditioms providing for the project:land,workshop,technology,part of equipmwents
(5) Communication methods:
Communication address:Yalujiang Grand Hoted Of Linjiang City ,Jilin Province
Post code:1346000
Link man of the project:Yan Shicai Zhang Yanming
Tel:86-439-5222867 5231538
Fax:86-439-5222186
|
|